MIL-PRF-28776F
TABLE VII. Group C inspection.
Inspection
Requirement
Test
Number of
paragraph
method
sample units
paragraph
for inspection
3
C1 (every month) 1/
Intermediate current
Dielectric withstanding voltage 2/
Insulation resistance 2/
Electrical characteristics 2/
Visual inspection (external)
C2 (every 6 months) 3/
2
Voltage transients
Thermal shock
Shock (specified pulse) 4/
Vibration 4/
Terminal strength
Dielectric withstanding voltage 2/
Insulation resistance 2/
Electrical characteristics 2/
Seal
Visual inspection (external)
C3 (every 6 months)
2
Overload (highest dc resistive load)
Life (highest rated dc, 50,000
cycles) 5/
Dielectric withstanding voltage 2/
Insulation resistance 2/
Electrical characteristics 2/
Visual inspection (external)
C4 (every 6 months)
2
Mechanical life
Dielectric withstanding voltage
Insulation resistance
Turn-on time and turn-off time
Visual inspection (external)
See footnotes at end of table.
22
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business