MIL-PRF-28750F
TABLE I. Qualification and group C inspection.
Inspection
Requirement
Test method
Samples
paragraph
paragraph
per group
Group Q1
Electrical system spike
12
Overload
Power dissipation
Visual and mechanical inspection
and 3.25
Group Q2
Resistance to solvents
Shock (specified pulse)
Vibration
Terminal strength
4
Temperature cycling
Seal
Moisture resistance
Insulation resistance
DWV
Electrical characteristics 1/
Visual and mechanical inspection
and 3.25
Group Q3
Crosstalk
Isolation
Resistance to soldering heat
Salt atmosphere (corrosion)
4
Insulation resistance
DWV
Electrical characteristics 1/
Seal
Visual and mechanical inspection
and 3.25
Group Q4
Life
Insulation resistance
4
DWV
Electrical characteristics
Seal
Visual and mechanical inspection
and 3.25
1/ Electromagnetic inference test shall not be performed.
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business