MIL-PRF-39016/38C
TABLE II. Qualification inspection and sample size.
Single submission
Group submission
24 units plus 1 open unit for
M39016/38-023
24 units plus 1 open unit for
level L at C = 0 1/
level L at C = 0 1/
33 units plus 1 open unit for
33 units plus 1 open unit for
level M at C = 0 1/
level M at C = 0 1/
Qualification inspection as
Qualification inspection as
Applicable.
Applicable.
M39016/38-001
2 units, each part number,
M39016/38-006
qualification inspection
M39016/38-010
table, group II.
M39016/38-019
M39016/38-018
2 units, qualification
inspection table, group II,
and shock, vibration,
acceleration, terminal
strength, and seal.
1/ The number of units required for qualification testing shall be increased as
required in group V, table II, MIL-PRF-39016, if the relay manufacturer elects to
test the number of units permitting one or more failures. Prior to performance of
qualification inspection testing the relay manufacturer shall preselect the sample
size.
Custodians:
Preparing activity:
Army - CR
DLA - CC
Navy - EC
Air Force - 11
DLA - CC
Review activities:
(Project 5945-1190-02)
Army - AR
Navy - AS, MC, OS, SH
Air Force - 19, 99
7