MIL-PRF-39016/14E
TABLE II. Qualification inspection and sample size.
Single submission
Group submission
18 units plus 1 open unit for
M39016/14-001
18 units plus 1 open unit for
level L at C = 0 2/
level L at C = 0 2/
33 units plus 1 open unit for
33 units plus 1 open unit for
level M at C = 0 2/
level M at C = 0 2/
Qualification inspection as
Qualification inspection as
applicable.
applicable.
2 units, each part number,
M39016/14-004
qualification inspection
M39016/14-006
table Q1.
M39016/14-009
M39016/14-011
M39016/14-014
2 units, qualification
M39016/14-003
inspection table, Q1,
and shock, vibration,
acceleration, terminal
strength, and seal.
1/ For retention of qualification or extension of qualification to low failure rate,
all life test data accumulated on MIL-PRF-39016/53 and MIL-PRF-39016/54 may
be used in addition to MIL-PRF-39016/14 data. Prior to retention of qualification
testing, the relay manufacturer shall preselect the sampling plans.
2/ The number of units required for qualification testing will be increased as
required in group IV, table II, MIL-PRF-39016, if the relay manufacturer elects
to test the number of units permitting one or more failures. Prior to
qualification testing, the relay manufacturer shall preselect the sampling
plan.
Qualification inspection (reduced testing) and sample size: See table III. If the relays produced for MIL-PRF-
39016/14 are similar in construction and design except for the diodes and coils to the relays produced for MIL-
PRF-39016/53 and MIL-PRF-39016/54, then reduced testing for qualification of MIL-PRF-39016/14 relays may be
performed concurrent with or subsequent to successful qualification of MIL-PRF-39016/53 and MIL-PRF-
39106/54.
TABLE III. Qualification inspection (reduced testing).
Examination or test
2 units each coil voltage - Q1 of qualification inspection table.
1 unsealed sample unit for internal examination.
6