MIL-PRF-28750F
Verify that input current (I(in)) is as specified (see 3.1).
c.
4.7.7.2.2 Input turn-on voltage (see 3.13.3).
a.
Test setup in accordance with figure 1.
Apply the specified (see 3.1) load, voltage, and frequency (if applicable).
b.
c.
Apply specified (see 3.1) input turn-on voltage (V(in)).
d.
Verify that the SSR is ON by measuring the output current (I(output)), or by measuring output voltage drop
(V(output)).
4.7.7.2.3 Input turn-off voltage (see 3.13.4).
a.
Test setup in accordance with figure 1.
Apply specified (see 3.1) load, voltage and frequency (if applicable).
b.
c.
Apply specified (see 3.1) input turn-on voltage (V(in)) to turn the SSR ON. Then apply specified (see 3.1)
input turn-off voltage (V(in)).
d.
Verify that the SSR is OFF by measuring the output current (I(output)) to be within leakage current
specification (see 3.1), or by measuring the output voltage (V(output)).
22
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business