MIL-PRF-11767G(AT)
TABLE II. Order of first article test - Continued.
Title
Requirement
Test
Sample 3
Interface
3.3-3.3.4
4.7
Support and ownership
3.5.1-3.5.2, 3.5.4, 3.5.5
4.9
Time delay
3.6.1
4.10.1
Pick-up voltage
3.6.4
4.10.4
Drop-out voltage
3.6.5
4.10.5
Contact voltage drop
3.6.7
4.10.7
Operating current
3.6.2
4.10.2
Coil current
3.6.6
4.10.6
Time delay
3.6.1
4.10.1
Pick-up voltage
3.6.4
4.10.4
Drop-out voltage
3.6.5
4.10.5
Contact voltage drop
3.6.7
4.10.7
Sample 4
Interface
3.3-3.3.4
4.7
Support and ownership
3.5.1-3.5.2, 3.5.4, 3.5.5
4.9
Time delay
3.6.1
4.10.1
Pick-up voltage
3.6.4
4.10.4
Drop-out voltage
3.6.5
4.10.5
Contact voltage drop
3.6.7
4.10.7
Endurance test
3.5.3
4.9.1
Time delay
3.6.1
4.10.1
Pick-up voltage
3.6.4
4.10.4
Drop-out voltage
3.6.5
4.10.5
Contact voltage drop
3.6.7
4.10.7
4.6 Verification methods. The types of verification methods included in this section are
visual inspection, measurement, sample tests, full-scale demonstration tests, simulation, modeling,
engineering evaluation, component properties analysis, and similarity to previously-approved or
previously-qualified designs.
4.6.1 Verification alternatives. The manufacturer may propose alternative test methods,
techniques, or equipment, including the application of statistical process control, tool control, or
cost-effective sampling procedures, to verify performance.
4.7 Interface and interoperability verification. Conformance to 3.3 through 3.3.4 shall be
determined using appropriate verification methods from 4.6 or 4.6.1.
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business