MIL-DTL-19648E
6.7.9 Instant recovery time (see 4.7.3.5.1). Instant recovery time is the time interval required for
cooling, after cutting off power to the energizing heater at the instant of the end of operate time, to regain
85 percent of the normal operate time at the next cycle of operation.
6.7.10 Saturate recovery time (see 4.7.3.5.2). Saturate recovery time is the time interval required for
cooling, after cutting off power to the energizing heater after saturation at rated voltage, to regain 85
percent of the normal operate time on the next cycle of operation.
6.7.11 Saturate time. Saturate time is the time interval after power is applied to the energizing heater,
starting with all elements of the relay substantially at ambient temperature, until all elements have
reached a substantially stable temperature.
6.8 Cross reference of part numbers. For the substitutability relationship of items covered by this
specification and items covered by superseded documents, see 3.1.
6.9 Inductors. Inductors meeting the requirements of MIL-I-81023, "Inductor, 28 V.D.C. Laboratory
Test, General Specification For" have been considered acceptable.
6.10 Changes from previous issue. Marginal notations are not used in this revision to identify changes
with respect to the previous issue due to the extensiveness of the changes.
Custodians
Preparing activity
Army - CR
DLA - CC
Navy - EC
Air Force - 11
(Project 5945-1197)
DLA - CC
Review activities:
Army - AR, AT, AV
Navy - AS, MC, OS, SH
Air Force - 19
25
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business