MIL-DTL-19648E
4.3 Inspection conditions. Unless otherwise specified herein, all inspections shall be performed in
accordance with the test conditions specified in the "GENERAL REQUIREMENTS" of MIL-STD-202.
4.4 First article inspection. First article inspection (see 3.2) shall be performed by the supplier after
award of contract and prior to production or delivery at a facility acceptable to the Government. First
article inspection shall be performed on sample units which have been produced with equipment and
procedures normally used in production. First article approval is valid only on the contract or purchase
order under which it is granted, unless extended by the Government to other contracts or purchase
orders.
4.4.1 Sample size. The number of relays to be subjected to first article inspection shall be as
specified in table IV.
4.4.2 Inspection routine. The sample shall be subjected to the inspections specified in table IV, in the
order shown. All sample units shall be subjected to the inspection, except solderability, of F1. The
sample shall then be divided as specified in table IV for F2 and F3 and subjected to the inspection for
their particular group.
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business