MIL-PRF-83536/14A
Qualification inspection:
Qualification inspection and sample size: See table IV.
TABLE IV. Qualification inspection and sample size.
Single submission
Group submission
M83536/14-002
18 units plus 1 open unit
18 units plus 1 open unit
for level L at C = 0 1/
for level L at C = 0 1/
M83536/14-002
33 units plus 1 open unit for level
33 units plus 1 open unit
M at C = 0 1/
for level M at C = 0 1/
Qualification inspection
M83536/14-002
Qualification inspection as
as applicable
applicable
M83536/14-001
2 units, qualification inspection
M83536/14-003
table, Q2, shock, vibration,
acceleration, terminal strength,
and seal.
1/ The number of units required for qualification testing shall be increased as required in
Q5, table II of MIL-PRF-83536, if the contractor elects to test the number of units
permitting one or more failures. Prior to performance of qualification testing, the relay
manufacturer shall preselect the sampling plan.
Supersession data: See table V.
TABLE V. Supersession data.
Superseded PIN
Replacement PIN
M6106/50-
M83536/14-
007
001
008
002
009
003
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business